Jeep Wrangler Forum

Jeep Wrangler Forum (http://www.wranglerforum.com/)
-   JK General Discussion Forum (http://www.wranglerforum.com/f274/)
-   -   How long does the actual build take? (http://www.wranglerforum.com/f274/how-long-does-the-actual-build-take-123291.html)

Chigger 11-18-2011 01:03 AM

How long does the actual build take?
 
Once they start to build, how long is the process?

Thanks

Redsand 11-18-2011 01:24 AM

not sure about jeeps, but when i built toyota tundras, it took about 24 working hours for one to come from a roll of steel in stamping to being driven off the end of the line

ngiovas 11-18-2011 05:35 AM

The average build time is 24 working hours, but if you want to know actual elapsed time until it is shipped, it will be longer than that. You have staging time, build time, inspection/test time, etc. Some people have posted that their car sat for days after being built. Others have had them ship very quickly after being built.

bwlyon 11-18-2011 06:00 AM

Took mine 45 days from tme of order to delivery to dealer. Flame Red, Rubicon, 2 Door, Loaded, 6speed.

QVphil 11-18-2011 06:18 AM

Exactly 5 weeks from the time I ordered it until the time I drove it home.


All times are GMT -5. The time now is 07:29 AM.